Edenex
Marketplace opportunity

Industrial pumps secured receivable

Marketplace opportunity memo with economics, protections, and due diligence perimeter.

Secured Loan

Fiat

Low risk

Docs ready for allocation

Target net yield

9.7%

Expected net investor return under current structure.

Allocation volume

$2.1M

Total allocation need required to complete marketplace matching.

Tenor

103 days

Expected cycle from allocation close to settlement release.

Minimum ticket

10,000 USDT

Minimum admissible allocation for participation.

Opportunity overview

Exporter
MechCore SRL (Italy)
Buyer
Morocco utility operator
Commodity
Machinery & equipment
Corridor
EU — Africa
Model
Secured Loan
Settlement rail
Fiat
Investor access
Qualified+
Documents available
Data room available

Risk and protections

  • Insurance coverage (Optional) applied per corridor policy.
  • Escrow mechanism (Mandatory) enforced for settlement protection.
  • Counterparty and jurisdiction checks completed before opening allocation.
  • Document registry enforces versioning and due diligence disclosure rules.

Economics and protections

  • Target net yield of 9.7% disclosed in the current term sheet.
  • Collateral structure and LTV ratio fixed at structuring stage.
  • Allocation remains subject to investor eligibility (Qualified+) and corridor policy.

Due diligence readiness

01Commercial packCore contract, buyer summary, and requested funding memo available.
02Legal packSecured Loan memo and primary legal structure disclosed.
03ProtectionsInsurance (Optional), escrow (Mandatory), and monitoring contours specified.

Route and corridor map

EU — Africa
Mode: Route validated in due diligence packETA: Transit plan under review
OriginItalyExporter-side dispatch and first-mile preparation.
Planned corridorEU — AfricaCore route, customs, or bonded transit checkpoint.
DestinationMoroccoBuyer-side delivery and settlement trigger location.
Origin
ItalyExporter-side dispatch and first-mile preparation.
Route
EU — AfricaCore corridor, customs, or bonded transit checkpoint.
Destination
MoroccoBuyer-side delivery and settlement trigger location.

Open deals show the planned export corridor before final logistics operators and milestone events are locked in.

Participants

01ExporterMechCore SRL (Italy)
02BuyerMorocco utility operator
03Settlement railFiat

Telemetry and operator feed

01RouteOperational route available once execution begins.
02CarrierAssigned at execution activation.
03TelemetryIoT / milestone events appear in active mode.

Timeline and events

01Pre-checkCounterparties, country corridor, and product flow are screened.
02ReadinessDocument set validated and remediation notes attached.
03StructuringSecured Loan structure, rail contour, and settlement waterfall are fixed.
04AllocationAll documents validated; deal ready for allocation.

Execution and settlement

  1. Fees, reserves, and waterfall logic follow approved deal terms.
  2. Capital deployment and settlement state change only on approved events.
  3. Residual release follows dispute and reserve rules.

Due diligence documents

DocumentRoomStatusVersion
Term sheetDue diligenceReadyv1.0
Commercial packCommercialReadyv1.0
Additional evidenceDisclosureReadyDraft